berikut adalah foto foto progress pembangunan masjid Adhwaus-salaf

tanggal 3 Juni 2010:

continuing mold for column

columns====================================================================

tanggal 2 Juni 2010:

mold for column column concrete

=====================================================================

1 Juni 2010:

sloof1

finishing sloof

=====================================================================

Tanggal 30 Mei 2010:

sloof moldsloof mold1sloof concrete

=====================================================================

Tanggal 29 Mei 2010:

sloof structure1

sloof structure

==========================================================

Tanggal 28 Mei 2010:

close the footstepclose the footstep1

 